Success Cases

Your present position:Home> Success Cases>Typical cases

Typical cases Performance map

30MW PV Power Generation 1st-phase Project in Sunoasis of CPI (China Power Inves

Release time:2015-03-28 The author:信息员

30MW PV Power Generation 1st-phase Project in Sunoasis, Ningxia Province of CPI generates power by grid-connection. The project is located at Sunoasis Development Zone, Wuzhong City, Ningxia Hui Autonomous Region. Scheduled capacity of the project is 50MW, with total land coverage of about 2500 mu. The 1st-phase total installed capacity is 30MW, annual average amount of on-grid energy during operation period is 41.5920 million kW•h, and the annual utilization hours are 1382.89h.

40 sets of 500kW inverters of our company are applied, all of which are functioning well currently. EPC is adopted for the project for construction with total dynamic storage investment of about RMB 419 million. The combination of 29MW polycrystalline silicon solar cell components and 1MW thin film cell components is adopted in the project, with fixed installation method. The project was checked and approved by DRC (Development and Reform Commission of the Autonomous Region) in February, 2011; in May, inspection for CDM of Sunoasis PV Project was completed by the Climate Change Department of National Development and Reform Commission. On December 30, 2011, the adjustment of electrical device test, protection set-up for outputting system and communication network debugging of the project were finished and power generation succeeded in first try.


Share the
Shut down